KUCAS: the inspection that happens in Dubai, not Kuwait
The Kuwait Conformity Assurance Scheme is run by the Public Authority for Industry. If your product is on the regulated list, it must be assessed before it ships.
Two documents, and people get this wrong
| Document | What it looks at | How often |
|---|
| Technical Evaluation Report (TER) | The product. Design, test reports, documentation against Kuwaiti, GSO and international standards | Occasional |
|---|
| Technical Inspection Report (TIR) | The consignment. Confirms what is in the container matches the approved evaluation | Every shipment |
|---|
Kuwaiti Customs wants to see the TIR. But the TIR is built on the TER, so you cannot get one without the other.
A shipper who applies for a TIR two days before sailing with no TER in place will miss the vessel.
What is covered
Electrical goods, electronics, toys, building materials, personal protective equipment, household appliances and more. Scope is defined by product category and HS code, which is why we check your code before booking rather than after.
Where it happens
At origin, before shipment. A PAI-approved inspection body performs the check in the country of supply. For cargo leaving Dubai, that means the physical inspection happens while the goods are still accessible in the UAE.
Once the container is sealed and gone, that opportunity has passed. Kuwaiti Customs will not release regulated goods without a valid TIR, and your cargo sits at Shuwaikh while storage accrues.
Plan the inspection and the sailing together. If you book freight first and think about certification afterwards, you have already lost time.